Concrete ROW --- thick, includes swale to CP, no steel. Parking and paths- 38 m2 100 mm thick. Concrete all 25MPa 10 mm regular aggregate- to be exposed. No pumping. Base course is prepared and boxing done (mostly abuts other concrete or existing retaining walls). Currently skinned with GAP 20 aw final shaping and compacting. ROW falls to CP; ramp up to garage and down to parking bay. When I review chops out detail ROW 64 m2 at 150 mm plus parking etc 38 m2 at 100 mm. 100 m2 in total.
#1 | Tradie 1 |
|
155 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
23 jobs | No longer in contact |
#4 | Tradie 4 |
|
67 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 17 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 20 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 24 jobs | No longer in contact |
#8 | Tradie 8 |
|
68 jobs | No longer in contact |
Partner with Builderscrack
Get work