We have an industrial warehouse property off Rosebank Road in Auckland. Some of the ashphalt is starting to break up, and we want to replace it with concrete. The area is about 9m x 11m [not accurately measured]. The concrete needs to be heavy duty, eg can cope with heavy truck driving and turning on it, and also full seafreight containers being unloaded onto it. The job includes removing/disposing of the old ashphalt that is replaced. A bit of ashphalting may be required, to tidy up one or two small holes elsewhere, etc.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Leigh was excellent
Work carried out by the owner/operator
Reviewed on 28-06-2019
Partner with Builderscrack