Remove existing tin cladding, install timber weatherboards on cavity to match an extension that was added 5-6 years ago. Verandahs require removal and reinstall with soffits added. All related joinery is being replaced mostly like for like size, some moving or changing size. We will apply for consent in the near future seek to get this project underway next 3-6 months. Architect will be Designgroup Stapleton Elliott Joinery supplier to be confirmed Quote is for other building related materials and labour
#1 | Tradie 1 |
|
6 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
7 jobs | No longer in contact |
#4 | Tradie 4 |
|
110 jobs | No longer in contact |
Partner with Builderscrack
Get work