Active job

BJ Chippindale

Job image
Job image
Job image

Job description

New Cladding
Porirua

Expect to get this done next Summer. Starting early so as to clear the consenting process. Single exterior wall, contains 3 double glazed windows. Existing wood cladding has insulation behind it at present (insulmax). Second floor (scaffolding required). Remove existing Wood cladding, check and repair any framing issues exposed - this may include diagonal bracing (discuss). reclad with hardiplank or other long-lived material, flashing as required, paint and finish. If insulation is removed in this process, replace. If Windows must be removed, preserve and replace (these are new windows). Scaffolding is on a slope with stairs. . Cost is a guess. Actually have no idea but certain it will hurt. Need your estimates.


Trade professionals

#1 Tradie 1
0 jobs No longer in contact
#2 Tradie 2 No recent reviews 7 jobs No longer in contact
#3 Tradie 3
18 jobs No longer in contact
#4 Tradie 4 No recent reviews 2 jobs No longer in contact
#5 Tradie 5
25 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo