Our rental property has a section of rotten weatherboard behind a water heater that we need cut out and replaced. Don't necessarily need painting, just the boards replaced. In total it's under 1x1m needing replacing. The water heater is getting removed for a week to do the job, but it needs to be back in place by Friday 14th Sept when the tenants return, so this is a somewhat time critical job!
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Dylan helped us out with a time-critical repair and got it done as promised. He went beyond the original scope and replaced some other rotten bits too, and primed it all ready for us to paint. A job well done!
Work carried out by the owner/operator
Reviewed on 24-09-2018