LBP designer is needed to get consent documents. Flashclad’s order has been made, materials are now in place. If you have a builder to do the works that are excluded in Flashclad’s quote, you can have the building works included as well. It’s for the upstairs only, since the downstairs currently has concrete blocks. Upstairs windows will also be replaced, a new window will be added to the stairs, window order has been made.
#1 | Tradie 1 |
|
35 jobs | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 |
|
0 jobs | No longer in contact |
Partner with Builderscrack
Get work