We had our bathroom refurbished. Once the floor was levelled there was a step of 25 mm on to tiles from the bedroom. We wish to have the carpet liftedin the bedroom and the floor feathered out so there is a small incline to the doorway and the carpet re layed. We need the carpet trimmed and stretched in the hallway.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good job
Work carried out by the owner/operator
Reviewed on 19-05-2019
#1 | Tradie 1 |
|
224 jobs | Secured job |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 |
|
145 jobs | No longer in contact |
Partner with Builderscrack
Get work