Time frame: ASAP Require a hard wood deck laid over top of tiles on concrete. There are three parts: 1. Top deck - approx 9 x 3.5 m 2. Stairs 3. Circular stairs at bottom - OK for these to be squared off if required There is also a section which has subsided. Ideally this would waterproofed before the deck is placed over top.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 4 jobs | No longer in contact |
#3 | Tradie 3 |
|
12 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 | No recent reviews | 2 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 9 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 10 jobs | No longer in contact |
Partner with Builderscrack
Get work