Build a deck, approximately 4x5m to sit under slider, and steps (3) to connect with the existing path and lawn (1 large step down). Timber to match existing deck and retaining. Deck requires hanging joists, as close to ground.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Hi, simple review really. Delivered on time. Perfect communication, listened PROPERLY to our needs. If you need a gate, fence, deck pergola, or anything else for that matter...don't use anyone else, use these guys. Once this company can do consented works, I'll have them back to do other jobs without a doubt.
Work carried out by an employee of the company
Reviewed on 03-02-2021
Partner with Builderscrack
Get work