Per building inspection report: "The rear access timber landing has settled with the ground below it which could be remedied. The posts could be dug out down to solid ground, the landing jacked up and post/hole filled with a larger footing of concrete and the balance of the paving relevelled." Screenshot from report is attached, with additional photos.
#1 | Tradie 1 | No recent reviews | 49 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 2 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 11 jobs | No longer in contact |
#4 | Tradie 4 |
|
27 jobs | No longer in contact |
Partner with Builderscrack
Get work