We would like a slightly elevated deck added to our backyard area with a ramp down where it needs to meet the ground. The goal is to match the level of the house which is no more than a metre off the ground. Deck slats to be screwed down using either composite or hard wood depending on quote. It would be good to have this done as soon as possible. The diagram is indicative only and not to scale.
#1 | Tradie 1 | No recent reviews | 36 jobs | No longer in contact |
#2 | Tradie 2 |
|
29 jobs | No longer in contact |
#3 | Tradie 3 |
|
34 jobs | No longer in contact |
#4 | Tradie 4 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work