Labour only to build subframe for 10 metres by 1-metre rear deck/walk access Post holes are dug (16) Need posts cut, positioned & levelled and bagged concrete poured, and bearers attached. (no Joists) All materials are on site although timber & bagged concrete will need to be moved to the location built (30 steps up). Looking to have this done in the next couple of weeks.
#1 | Tradie 1 |
|
3 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work