hi we are mid kitchen install and we need three older cabinets levelling so the stone top isnt uneven. remove cabinets align with new cabinets reinstate cabinets as soon as would be good so we can get the stone measured and cut. ( brother in law has done the new cabinets but works full time so doesnt have time to get the levelling done)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
very good job, completed within the time frame. Clean , tidy, efficient. would recommend
Work carried out by the owner/operator
Reviewed on 21-03-2022
Partner with Builderscrack
Get work