I have removed the old decking material, the framing is still there. I need new decking laid and stairs built out the front of the deck. The deck is approx 2.6 m X 1m and is .6m high so will need two or three steps built.
#1 | Tradie 1 | No recent reviews | 38 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 9 jobs | No longer in contact |
#3 | Tradie 3 |
|
52 jobs | No longer in contact |
#4 | Tradie 4 |
|
473 jobs | No longer in contact |
#5 | Tradie 5 |
|
22 jobs | No longer in contact |
#6 | Tradie 6 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work