One of our bargeboards (approx 4.5m long) on a Lockwood home (constructed approx 1999) is rotten and needs replacing. We have ordered the replacement board from Lockwood direct and will paint it ourselves, please allow for: 1. Removal and disposal of old bargeboard. 2. Cut new bargeboard to length and shape. 3. Install new bargeboard and reinstate flashing etc. 4. Any sundry materials needed e.g. fixings. 5. Access is somewhat constrained by nearby shed (1.3m off wall) and trellis (aligns with roof peak). Refer photos. Ground has slight slope. Timing can be flexible, could start next week.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work and easy to deal with, thanks Matt!