Looking for a builder who can install new painted MDF door fronts, side panels and toe ticks to existing kitchen. Then hang new wall cabinets and over the fridge cabinet, as well as add new panels. Should only be a days worth of work at the most. Work can start from the 3 August.
#1 | Tradie 1 |
|
13 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work