Four decking boards need replacing. Need to take out four old boards and replace with four new boards. Two of the boards are 4.5 meters long and will need to be collected/transported form Placemakers in Albany. Also two step boards need replacing on the steps leading to the decking from the pool deck.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent would use again!
Work carried out by the owner/operator
Reviewed on 27-05-2018
Partner with Builderscrack
Get work