Review

Hot water cupboard

Job image
Job image
Job image
Job image

Job description

General Carpentry
Palmerston North

Build a hot water cupboard build in a corner around new hot water cylinder, in rennovated home already on the market. Needs to be done by Aug 15! Approx --- walls floor to ceiling, single layer of gib or plywood? narrow door sliding or swinging, shelves with slats. Ceiling is slightly sloped. Floor has vinyl already. The plan shown is just an idea, framing etc doesnt have to be done like this and door can be sliding if easier/better. Note: electrical work and compliance has been completed since the photo shown.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Wow. Brook did a fantastic job of our hot water cupboard with great attention to detail and some pretty fine joinery, even when there was a lot of fiddly plumbing to work around. He was flexible and made an effort to keep in touch throughout. And we were lucky enough to get him on short notice.

Work carried out by the owner/operator
Reviewed on 09-08-2021

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo