Removal of about 270sq metres of decking. Replace with durable wood (specify material in quote) lengths (10-18cm wide), nailed regularly (40cm). Prepared for water, moss etc and stained as per existing deck. All waste to be removed from site (not left under deck) and area to be left in condition found. There are 2 deck areas - one about 190 sq metres, other 180 sq metres. Deck areas can be completed at different times. Windows of time open included: Nov --- , Dec --- , Jan --- .
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Stan was excellent to work with, communicated clearly and delivered as proposed. All surprises he found on demolition were clearly communicated with options. He was both helpful and responsive.
Work carried out by the owner/operator
Reviewed on 23-03-2020