Active job

Interior renovations

Job image
Job image
Job image

Job description

General Carpentry
Manawatu

Removal of existing Kitchen wall linings (on either side of window) and replaced with 10mm standard gib board. Construct new wall (rear of fridge as shown in pic - approx 1.6m long) using 10mm gib board.....extend existing bulkhead to match (above & right of fridge in pic) Supply & fit new window sill & architraves to kitchen window. Gib stop all re-lines areas including filling holes in ceiling (above fridge) where downlights have been removed.


Trade professionals

#1 Tradie 1 No recent reviews 6 jobs No longer in contact
#2 Tradie 2
60 jobs No longer in contact
#3 Tradie 3 No recent reviews 10 jobs No longer in contact
#4 Tradie 4
112 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo