The bathroom was divided by a 3/4 high wall to separate the toilet from the bathroom. The wall has been reduced in height, however, the frame needs to be finished off (98cm long) and the wood removed from the wall (1.25m) so both areas are ready for plastering. Where the sliding door used to be needs to be made flush and ready for plastering. Wood from the old frame is available for re-use.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ioane was great and kept in touch, and even managed to squeeze the work in earlier than expected which worked out perfectly. He cleaned up as well which was much appreciated. Really great work and will definitely use again.
Work carried out by the owner/operator
Reviewed on 27-07-2020