The current corrugated iron needs to be removed and 100mm wide pine tongue and groove strips need to be attached vertically with no visible nails, skirting board around the base and then the whole lot needs to be stained black. The counter and left side is about 5m total. If you only want to attach the T&G then I can organise a painter serarately
#1 | Tradie 1 | No recent reviews | 15 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 |
|
215 jobs | No longer in contact |
Partner with Builderscrack
Get work