We have a concrete pad outside our lounge. The pad is cracked and unsightly. We would like to put decking timber over it. A leveling subframe will be necessary as the concrete pad slopes away from the house.. The area to be covered is 4.5 x 3 metres.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
These guys did a great job. I would recommend them to anyone. Very pleased with the finished jod. Cleaned up and disposed of rubbish. Prompt on the job.
Work carried out by the owner/operator
Reviewed on 08-11-2020