We have had a slow leak in behind a tenant's shower for some time and need address it. Scope of work: - Remove 2 glass-sided shower, keeping base for reuse - Pull up strand board floor (Approx - 2m x 2m section) - Leave open to dry - Replace flooring with edge blocking as needed - Replace Aqualine Jib behind shower (Approx 1m x1.8m) Job is ready to go and could meet on site tomorrow evening. No plumbing involved (shower to be installed after flooring is replaced)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great worker. No hesitation to use again.
Work carried out by the owner/operator
Reviewed on 31-05-2021
Partner with Builderscrack
Get work