I need a floor laid in my new shed. It is 35m2, around a central pole and surrounded by a 2-block-high nib wall. I have 9 x framed plywood shutters/cassettes I want to use, and I think it would be a good idea to put some polystyrene in them, before laying them down. I want to lay plastic down first, then spread the cassettes around and fill in the gaps with ply. I expect it will take 1 - 1.5 days.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I was pleased that James and RJ used the panels I had, even tho' it was a bit awkward. There was a minor hiccup when RJ, James's side-kick, didn't put the black plastic down first, but when I pointed it out, this was quickly remedied, even though half the floor was down already. The job was finished in the time specified, and I was pleased that as an older woman, I was not side-lined, and was trusted to get the extra materials needed for the job.
Work carried out by the owner/operator
Reviewed on 23-07-2019
Tradesperson reply
"Thanks a lot maam Helen. I appreciate that you trust Felarca Builders Limited to do the job. Cheers James."
Partner with Builderscrack
Get work