Review

Shed Floor

Job image
Job image
Job image

Job description

Floor Board Repair
Christchurch

I need a floor laid in my new shed. It is 35m2, around a central pole and surrounded by a 2-block-high nib wall. I have 9 x framed plywood shutters/cassettes I want to use, and I think it would be a good idea to put some polystyrene in them, before laying them down. I want to lay plastic down first, then spread the cassettes around and fill in the gaps with ply. I expect it will take 1 - 1.5 days.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

I was pleased that James and RJ used the panels I had, even tho' it was a bit awkward. There was a minor hiccup when RJ, James's side-kick, didn't put the black plastic down first, but when I pointed it out, this was quickly remedied, even though half the floor was down already. The job was finished in the time specified, and I was pleased that as an older woman, I was not side-lined, and was trusted to get the extra materials needed for the job.

Work carried out by the owner/operator
Reviewed on 23-07-2019

Tradesperson reply
"Thanks a lot maam Helen. I appreciate that you trust Felarca Builders Limited to do the job. Cheers James."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo