Bracing on a playground tower to bring it up to standard and replacing a panel on the climbing wall attached to the tower, the panel is splitting at the end and bolts have sheared off when attempting to remove. Work needs to be able to be completed asap as it is a health and safety in School issue.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good communication and work, easy to talk to and were prompt with work and communication.
Work carried out by the owner/operator
Reviewed on 22-02-2019
Tradesperson reply
"Jeni and Merrin school were very easy to deal with, I would not hesitate to work for them again at any time,
Thanks From
PBS Ltd"
Partner with Builderscrack
Get work