Our new hot water cylinder was installed in the linen cupboard under the stairs. We had to take the old shelves out to do it. I need new shelves built on either side of the hot water cylinder. The plaster board where the other cylinder was will need replacing. They are rotten from the hot water cylinder leaking.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Sturdy neat shelving installed in a timely manner. It cost more than I expected.
Work carried out by the owner/operator
Reviewed on 22-01-2020
Partner with Builderscrack
Get work