We have recently removed an electric water heater from a cupboard and now would like to put in shelving and box in the pipes that remain there. There are a few holes in the wall where some patch up work is also required. We have some leftover floorboards that could also be cut to size to line the floor of the cupboard. It is a single cupboard and we would like to do this rather urgently if possible.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Logan was very responsive and kept me posted on progress. Cupboard looks really good. We are pleased with how it looks and the workmanship was fine.
Work carried out by the owner/operator
Reviewed on 02-09-2019
Partner with Builderscrack