Published on 1st June 2026
Recently replumbed a bathroom and now we need the plasterboard reinstated on the wall as well as plastering.
| Quality of work |
4.0
|
The quality of workmanship provided |
| Cost |
3.0
|
How well they kept to the quoted cost |
| Schedule |
4.0
|
How well they kept to schedule |
| Communications |
4.0
|
Their professionalism and responsiveness |
"Dwayne was very friendly"
Work carried out by the owner/operator
Review posted by Vania on 13th June 2026
Verified work review
Partner with Builderscrack
Get work