Active job

Retaining on a new section

Job description

General Building
Western BOP

I am in the process of building a new home at Lynley Park Omokoroa the earthworks have been done and the floor has just been layed. I'm wanting to obtain a quote on some retaining needed to be done on 3 sides of the section. (each side is approx 20-30metres). I'd be really grateful if I could obtain a no obligation quote at this stage and possibly get someone out to my section so it can give you a clearer prospective. Many Thanks.


Trade professionals

#1 Tradie 1 Not reviewed 0 jobs No longer in contact
#2 Tradie 2 Not reviewed 0 jobs No longer in contact
#3 Tradie 3 No recent reviews 0 jobs No longer in contact
#4 Tradie 4 No recent reviews 7 jobs No longer in contact
#5 Tradie 5 No recent reviews 14 jobs No longer in contact
#6 Tradie 6 No recent reviews 1 job No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo