We need Our bathroom Removed and Walls fixed and plastered so we can paint. The laundry needs plastering . Kitchen is ordered and there is tile splash back that needs removing. Need all this done as soon as possible😬 Kitchen May or may not be ready before Christmas and flooring is coming some time after Christmas
#1 | Tradie 1 | No recent reviews | 8 jobs | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
#4 | Tradie 4 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work