A ventilation cowl was installed when rebuilding our bathroom. However, the installer didnt add scribbers and a headflashing. This is now an outstanding item on our CCC and needs to be finished before our final inspection. Cowl on the right has since been replaced to match the left cowl.
#1 | Tradie 1 |
|
216 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 |
|
92 jobs | No longer in contact |
Partner with Builderscrack
Get work