Published on 2nd August 2024
we need the wall finished around a stall shower that was installed in an older home. The wall required leveling and does not now line up to the existing surface. Plaster board and tile edges. Tidy so ready for paint.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"Very happy with the job. Needed a creative fix to an old house problem of misalignment. Aldrin was prompt, work to a high standard and a good price. Would work with him again."
Work carried out by the owner/operator
Review posted by Rebecca on 11th August 2024
Verified Builderscrack review
Partner with Builderscrack
Get work