A portion of the kitchen floor is swollen from a historic water incident I'm guessing and I need it repaired / replaced to put down new flooring. I would guess a couple of sheets of ply under dishwasher and in doorway. Probably a day or two of inside dry work. Preferably in the next month.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
James and his guys were fast, easy to deal with, did a great job and the estimate was accurate
Work carried out by an employee of the company
Reviewed on 24-07-2022
Tradesperson reply
"Thanks for review"
Partner with Builderscrack
Get work