Closed job

Repair floor under tiled shower nib

Job image
Job image
Job image
Job image

Job description

General Building
Waitakere

Replace water damaged floor and structural timbers under tiled nib of 1st floor shower unit. Above ground floor ceiling. Some ceiling Gib board has been removed to allow inspection of damage. Remove shower nib, which supports glass shower door and adjacent glass panel - and - replace,retile and waterproof. Tiled shower floor is epoxy grouted. The seal between the tiled shower walls/ nib and floor is silicone.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo