Published on 4th November 2026
The portico roof has dropped by approximately 10cm and needs releveling. We think this is caused by land movement under its support pillars, as it's close to a stream. The house and its foundations (on poles) are fine, and we haven't seen any movement elsewhere in 20 years. A structural engineer has not been involved. The two pillars appear to have decorative plaster casings, and we suspect there are timber posts inside supporting the roof. The pillars also appear to have their own foundations rather than resting directly on the concrete slab. We previously had Mainmark visit and assess the area, but they were unable to lift the concrete slab, as it wouldn't have the desired outcome because the pillars rest on their own foundation. They advised that a builder was better suited to the job. Our initial thoughts are that the remedial work could involve: opening up the plaster casings to inspect the internal supports; temporarily propping up and levelling the portico roof; and extending the supports by approximately 10cm, if appropriate, so the roof can be properly supported once lowered back into position and be horizontal again. Ultimately this prep work is required so that new guttering can be installed.
Partner with Builderscrack
Get work