5 barge boards rotted lower ends, require replacing rotted parts. 1 barge board warped and rotted lower end needs replacing whole board approx 6 meter length. 2 shorter fascia boards rotted require replacement. Painting firm arriving end of March.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Awesome experience with Shane. Very easy to deal with made sure he had all work instructions correct. Suggested options along with costs for the work to be done. Very clearly explained how he would do the work and materials with costs which allowed for budgeting. Shane completed the job to a very high standard and this was also commented on by the painting contractors who followed. I would recommend Wagstaff builders and Shane to anyone requiring work of high quality. John Thomson
Work carried out by the owner/operator
Reviewed on 08-04-2022
Partner with Builderscrack
Get work