Construction of the walls as per plans Install ceiling over bathroom Install hand rail in accessible toilet Install door to accesible toilet Build counter wall and clad around POS joinery once installed. Install signage. Install merchandise shelving (supplied by Habitual fix). Install slats to walls and part of the ceiling Install steel gantry Install leaners and tables and brackets for lights All plans to be provided Builder must be inducted to site and will oversee other trades on the job. They must provide a health and safety plan.
Partner with Builderscrack
Get work