To increase the size of our kitchen footprint we are absorbing the study. Taking down an internal wall it looks to me to be a support for two ceiling joists which I think need extending to the outside wall - about 1.5metres . i would hope that this could be done in a day by a registered tradesman.
#1 | Tradie 1 |
|
49 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 28 jobs | No longer in contact |
Partner with Builderscrack
Get work