We are adding two rooms on to the end of the current single story dwelling and require the preparation required for the concrete slab floor. The area is 27 sq/ms
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Once we finally received the consents,Evan started and completed the job within four days, despite having to cope with what nature threw at him. Highly reccommend Evan.
Work carried out by the owner/operator
Reviewed on 13-08-2010
Tradesperson reply
"thanks great people to deal with"