Active job

building code to

Job description

Home Extensions & Alterations
Tauranga

The back verandah was extended by a builder who stated because it was existing it did not need consent/certificate of acceptance. We have been informed that the as-built construction needs to be fully substantiated and structural adequacy assessed by a structural engineer to confirm it meets building code requirements. We have all the building material receipts and all the electrical, gas and plumbing certified. Then do we need a certificate of acceptance report and application????


Trade professionals

#1 Tradie 1
111 jobs No longer in contact
#2 Tradie 2
10 jobs No longer in contact
#3 Tradie 3
8 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo