relocate existing window. Make good stud wall. Remove garage roller door and replace with relocated window and insulated stud wall. Replace person door. Remove washbasin, taps and exposed pipes and make good. Board underside of stairs. Work completed by mid Feb.
#1 | Tradie 1 |
|
12 jobs | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work