Active job

9 Flight Valley Retaining wall

Job image
Job image
Job image

Job description

Retaining Walls (Above 1.5m)
Tauranga

Published: 19 September 2024

Need to build two retaining walls TRW1 and TRW2. Specification for TRW1 - about 40m long, Retention Height, H (mm) - 1500 Surcharge,(kPa)- 2 Pole Density - High Pole Dia, Dp (mm) - 375 Concrete Dia, Dc (mm) - 600 Embedment depth, D (mm) - 4200 Backslope angle β- min 0° Specification for TRW2 - about 30 m long, Retention Height, H (mm) - 2500 or more Surcharge,(kPa)- 2 Pole Density - High Pole Dia, Dp (mm) - 350 Concrete Dia, Dc (mm) - 500 Embedment depth, D (mm) - 3300 Backslope angle β- min 22°


Trade professionals

#1 Tradie 1
4 jobs In contact
#2 Tradie 2
6 jobs In contact
#3 Tradie 3 Not reviewed 0 jobs In contact
#4 Tradie 4
6 jobs No longer in contact
#5 Tradie 5
3 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo