Closed job

MediBoard installations @ Taupo Hospital on June 28th

Job image
Job image

Job description

General Building
Taupo

We have a network of information boards that hold brochures and posters, we need a handyman with great attention to detail and customer service to visit medical centers and put these boards up or remove them if the site is shifting. The jobs usually take around 30 mins • Our builder/installer uses a jig to hold the weight of the mainboard and ensure the installation is safe, simple, and consistent height off the floor; that is 740mm so that you can reach the top row easily • We use a toggle clamp (like an F clamp) and toggles that hold the weight of the boards • The board is then installed using Hollow/Dry Wall Anchor Fasteners 10-16mm (screw or something similar) that fix the boards to the walls, which of course will be reimbursed with any other material charges. • All the outer corner clear plastic slots are to be removed for installing, then once screwed into the wall these can be put back • Where possible we put the boards' side by side, and we always install a MediPoster unit with the mainboard Full instructions will be supplied and you will meet our representative Sara on-site on June 28th, thanks


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo