Large metal shed needs to be put up on a flat surface. Base will need to be leveled. This is probably a2 to3 day job.base was built before 1st covid lockdown and builder who was to finish the job has been too busy .Have been waiting from June to have this job done. This job is part one to getting the house demolished and a new building put on site.
#1 | Tradie 1 |
|
10 jobs | Secured job |
#2 | Tradie 2 |
|
32 jobs | No longer in contact |
Partner with Builderscrack
Get work