Published: 24 September 2024
Bathroom ceiling popcorn around 2 x 2 metres to make flat and some wallboard Plastering in the bathroom and in office that was the bathroom, ie some new Gib patching done. Photos attached, bathroom as in photos with rimy slats has been stripped out and regibbed where bath was, this is now an office. The new bathroom is now in where the laundry was so patching done where water cylinder was and around new entrance into a shower room
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
8 jobs | No longer in contact |
#3 | Tradie 3 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work