The house is being painted and the upper level barge boards need replacing. Scaffolding will be in place from --- on the non-driveway side. The painter will use a tower for the driveway side. The flashings maybe do not extend fully to cover the ends of the current barge boards too.
#1 | Tradie 1 |
|
10 jobs | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 13 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 4 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work