Bathroom and Workshop areas inside shed to be lined. Framing completed, may need some additional nogging. 12mm plywood to walls, 12mm plywood to workshop ceiling, 13mm GIB plasterboard to bathroom ceiling. 23mm plywood to ceiling joists above both spaces. Plywood has been bought and is on site. There is additional timber framing on site available for nogging. Two interior timber doors will need to be purchased and installed, as well as trims to windows, doors and skirting. Looking to have this work completed mid-January 2020, if possible.
#1 | Tradie 1 | No recent reviews | 11 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
10 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 13 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 2 jobs | No longer in contact |
#7 | Tradie 7 |
|
56 jobs | No longer in contact |
#8 | Tradie 8 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work