Published: 25 September 2024
The bedroom sliding door currently opens to a drop so a deck is required. Looking to come out 4m and go along the end of the house to connect to the existing deck there. The house will require other building related things done like replacement of some rotten cladding before painting. Note the driveway is 2km long and requires a 4WD to access the house. Please send me an initial price indication when requesting contact.
#1 | Tradie 1 |
|
73 jobs | No longer in contact |
#2 | Tradie 2 |
|
0 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
#4 | Tradie 4 |
|
18 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work