I have two decks, a concrete/tiled deck which needs handrails for steps and balustrading for security. (About 24 metres). Decking is about a metre above ground level. There is a second deck which also needs balustrades and hand rails to steps and is also a metre above ground level.(About 4 metres). Prefer powder coated aluminium
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner & subcontractors
Reviewed on 17-08-2019
Partner with Builderscrack
Get work